Is it enough to see utilities close to the boundary?
No. Available capacity, connection point and conditions, route, timing and likely cost must be evidenced. Until the utility responds formally, those parameters remain subject to evidence limitations.
Does the audit replace legal review and surveys?
No. Title review, topographic survey, geotechnical, hydrogeological, environmental and laboratory work are separate disciplines. The audit identifies which are decision-critical and when they are needed.
Can utility conditions and capacity be guaranteed?
No. The relevant utility confirms them. ALMECO tests the evidence available, identifies gaps and prepares focused enquiries and decision conditions.
When should the audit be ordered?
Before a deposit, option, acquisition, long lease, joint venture, financing or final site approval. Constraints generally cost more to manage after commitment.
How is site due diligence different from project feasibility?
Site due diligence tests one defined parcel against an intended project. Feasibility compares project options, delivery models, order-of-magnitude CAPEX/OPEX and the investment case. Use feasibility when the project direction is still being chosen and site due diligence when the land itself must be tested.