Almaty, Kazakhstan
All services

Specialist services for decision-making

Technical concept development, Pre-FEED & FEED

We fix the requirements, select and develop the technical solution, and define scope, interfaces and inputs for detailed design or an EPC tender.

Service boundary

This service answers one specific management question.

How should the selected option become an aligned technical concept ready for design or an EPC tender?

Main output
Basis of Design, Concept, Pre-FEED/FEED, scope boundaries, interfaces and next-stage readiness criteria.
Do not confuse with
It starts after direction selection and is not an independent property transaction review.

Overview

Client benefits

What this engagement helps you protect, clarify or improve.

  • Move from an approved option to one technical basis without reopening the investment-scenario decision.

  • Define design criteria, scope boundaries, interfaces and required inputs early.

  • Improve the reliability of cost, schedule, procurement strategy and designer or EPC-contractor briefs.

Overview

Typical deliverables

The final scope is tailored to the decision, project stage and information available.

  • Confirmed technical baseline and register of inputs and gaps affecting development.

  • Project requirements, Basis of Design and design criteria.

  • Technical alternatives within the selected direction and a preferred-solution recommendation.

  • Development or coordination of Concept, Pre-FEED and FEED packages.

  • Preliminary schemes, layouts, balances, specifications and calculation bases at the agreed depth.

  • Interface, risk and decision registers and readiness criteria for detailed design or EPC tendering.

Demo, packages and fee guidance

Review a sample output first, then select the required depth.

The Demo shows the output structure and quality using a wholly illustrative asset. Standard and Premium start only after input review and scope confirmation.

DEMO — sample output

Free

PDF · EN · 5 pages

Sample Engineering Definition Pack

Basis of Design, deliverable maturity, interfaces, decisions and next-stage readiness.

Best for
Assess the format, logic and practical value before appointment.
Typical timing
Immediate download after a short form
  • A separate version in the page language.
  • Illustrative and fictional data only.
  • No review of the visitor's asset and no professional opinion.

STANDARD — Concept Definition

Scope confirmed after a brief

individual quotation after a brief

Best for
A selected option that must become an aligned technical basis for the next stage.
Scope and timing
After discipline, deliverable and maturity criteria are defined
  • Basis of Design and input register.
  • Concept diagrams, layouts and design criteria.
  • Interfaces, assumptions and open decisions.
  • Readiness criteria for design or an EPC tender.

PREMIUM — Pre-FEED / FEED Programme

Scope confirmed after a brief

individual quotation

Best for
Multidisciplinary development to an agreed maturity with calculations, specifications and cost/schedule basis.
Scope and timing
Against an agreed deliverable register and programme
  • Scope and maturity criteria for each discipline.
  • Calculations, diagrams, specifications and interface control.
  • Cost, programme and procurement basis.
  • Next-stage gate readiness review.

A numeric fee without “from” applies to the stated package. “From” is a starting guide for the base scope shown in the card. Final scope, timing and fee are fixed in the proposal before work starts. Official charges, laboratories, surveys, external specialists and third-party services are included only when expressly stated.

Packages marked “Scope confirmed after a brief” are scoped individually: materially different assets should not be sold with one identical scope or timing commitment.

Overview

Typical use cases

Situations in which this service is commonly valuable.

  • An investment option has been selected and must become a technical brief and engineering concept.

  • Brownfield expansion, rehabilitation, integration or change of use.

  • Preparation for detailed design, working documentation, EPC/EPCM tendering or budget refinement.