Almaty, Kazakhstan
All services

Specialist services for decision-making

CAPEX, life-cycle cost, constructability, value engineering & risk

We challenge scope, cost drivers, buildability and risk to protect value across the asset life cycle.

Service boundary

This service answers one specific management question.

Is the budget realistic, and where can cost or risk be reduced without weakening the required outcome?

Main output
CAPEX/TOTEX validation, value engineering, constructability, contingency and quantitative risk analysis.
Do not confuse with
It uses technical inputs but does not itself establish the condition of a site or building.

Overview

Client benefits

What this engagement helps you protect, clarify or improve.

  • Improve transparency of capital cost, operating cost and contingency assumptions.

  • Identify avoidable CAPEX and whole-life cost without sacrificing required performance.

  • Resolve construction constraints and high-impact risks before procurement or site execution.

Overview

Typical deliverables

The final scope is tailored to the decision, project stage and information available.

  • Estimate basis, cost model and CAPEX validation.

  • OPEX, life-cycle cost or whole-life/TOTEX assessment.

  • Constructability and logistics review.

  • Value-engineering options with cost, performance and risk implications.

  • Quantitative or qualitative risk and contingency assessment.

  • Localisation, market-price, material-consumption and productivity intelligence where relevant.

  • Benchmark, change-impact and decision register.

Packages and fee guidance

Preliminary CAPEX for a decision—not false precision.

The fee is confirmed after reviewing inputs, scenario count, asset scope and required depth. Every issue states assumptions, uncertainty and the data needed for refinement.

DEMO — sample output

Free

PDF · EN · 5 pages

Sample preliminary CAPEX and risk register

Cost structure, assumptions, contingency, uncertainty range and a cost-risk register.

Best for
Assess the format, logic and practical value before appointment.
Typical timing
Immediate download after a short form
  • A separate version in the page language.
  • Illustrative and fictional data only.
  • No review of the visitor's asset and no professional opinion.

STANDARD — Concept CAPEX

from KZT 1,200,000

Best for
An early budget for one defined scenario and an initial investment-screening decision.
Typical timing
Typically 7–10 working days after data readiness
  • One scenario and agreed cost structure.
  • Input and assumptions register.
  • Base estimate, contingency and uncertainty range.
  • Concise memorandum and working table.

PREMIUM — Investor CAPEX

from KZT 3,500,000

Best for
An investor, lender or developer needing options, risks and evidence for the next gate.
Typical timing
Typically 12–20 working days after data readiness
  • Up to 3 agreed scenarios or phases.
  • Expanded assumptions, contingency and sensitivity.
  • Cost risks, exclusions and verification plan.
  • Report, working model and closing workshop.

This is a preliminary engineering estimate for investment and management decisions. It is not a statutory estimate, tender price or guarantee of final cost. TOTEX and life-cycle cost, Value Engineering, constructability, quantitative risk analysis and claims are separate Custom modules. A numeric fee without “from” applies to the stated package. “From” is a starting guide for the base scope shown in the card. Final scope, timing and fee are fixed in the proposal before work starts. Official charges, laboratories, surveys, external specialists and third-party services are included only when expressly stated.

Overview

Typical use cases

Situations in which this service is commonly valuable.

  • Validation of an investment budget or contractor estimate.

  • Design-to-budget exercise or comparison of technical alternatives.

  • Review of tender returns, scope changes, claims or remediation options.